- Home
- Government
- Departments
- Engineering
- Land Development
- Land Development Procedures & Guidelines
Land Development Procedures & Guidelines
To Developers and their Engineers:
The documents found on this page related to the Engineering Department Procedures and Guidelines may be helpful, however, prior to starting the process of submitting improvement plans and/or maps and other documents for Engineering Department review, it is recommended that you contact and meet with the City's Principal Land Development Engineer to discuss the process. The Land Development Principal Engineer may be reached via phone at 408-586-3316.
Improvement Plans & Map Requirements
Streetscape, Street Design & Lighting
Stormwater Quality Protection
- Construction Best Management Practices (PDF)
- Definitions (PDF)
- Fact Sheet for Hydromodification Management Requirements (PDF)
- Fact Sheet for Project Applicants (PDF)
- Fact Sheet for Road Projects in the Municipal Regional Permit (PDF)
- Low Impact Development Required for Regulated Projects (PDF)
- Model Conditions of Approval for Stormwater Quality (PDF)
- Provision C.3 Data Form 07/01/2023 (PDF)
- Site Design and Source Control Required for All Projects (PDF)
Water – Potable
Landscape Plan Design
Solid Waste & Recycling
Standard Specifications
Miscellaneous
- Deposit and Fees 07/2023 (PDF)
- Lot Combination Procedure (PDF)
- Lot Line Adjustment Application (PDF)
- Map Requirements (PDF)
- Midtown Specific Plan (PDF)
- Notice to Applicants, Developers and Engineers (PDF)
- Right-Of-Way Vacation (PDF)
- Sanitary Sewer (PDF)
- Signing and Striping Plans (PDF)
- Transit Area Specific Plan (PDF)
- Site Demolition Checklist for Commercial (PDF)