Architectural:
Clearance Required for Kiosks and Carts in Covered Mall
Commercial or Multi-Family Electric Vehicle (EV) Charging Station
Common Path of Travel From Second Floor
Group H-5 Occupancy in Unlimited Area Buildings
Hazardous Materials Control Areas in Existing Building
Individual Fire Protection of Primary Structural Frame
Interior Wall and Ceiling Finishes in Buildings of Non-combustible and Fire Rated Construction
Offices and Restrooms in Restaurant Kitchens
Offices and Restrooms in Stockrooms in Group M Occupancies
Residential Spaces in Religious Assemblies
Requirements for Construction of Balconies
Security Doors Equipped with Non-complying Delayed Egress Locks
Solar Photovoltaic Panels Supported by a Structure over Parking Stalls
Structural:
Allowable Lateral Bearing Pressure for Pole Type Footings
Nonstructural Components Requiring Seismic Anchorage or Restraining
Posting of Protected Zone in Intermediate and Special Steel Moment-Resisting Frames
Requirements for Construction of Balconies
Special Inspection for Pre-Cast Wall Columns
Water Heater Installation on Top of Ceiling Framing
Electrical:
Access To Electrical Equipment
Electrical Service Lock Out Tag Out
Multi-Tenancy Branch Circuits & Disconnects
Outlet Requirements for Offices
Protection of Working Space Clearances at Electrical Equipment
Water Bonding to a Grounding Electrode
General:
Reactivating Permits to “Close out”
Mechanical:
Booster Fan Use in Clothes Dryer Exhaust
HVAC Smoke Detector Performance Test
Kitchen Grease Duct Fire Wrap Policy
Smoke Detectors in Great Mall Tenant Spaces
Plumbing:
Disinfection of Potable Water System
High Density Residential Building Sewer Cleanouts
New and Modified Gas Piping Systems
Water Heater Pressure & Temperature Termination in Garages
Sign: